The Royal Commission for Riyadh City announced Sunday that it has begun construction of the Expo metro station, a key addition to the Riyadh Metro network that will cover approximately 70,000 square meters. The facility is engineered to accommodate up to 19,000 passengers per hour and forms part of infrastructure supporting the 2030 World Expo in the Saudi capital. According to the commission, the project advances coordinated development plans that align transport upgrades with the event venue’s timeline.
Located on the Yellow Line connected to King Khalid International Airport, the station will extend above King Salman Road within a dedicated green corridor, the commission reported. This corridor links the Expo 2030 site eastward to planned urban expansion areas westward, enhancing connectivity across northern Riyadh. The positioning ensures the station will serve both event visitors and long-term regional needs once complete.
Architectural elements draw from Riyadh’s natural terrain, specifically its valleys and acacia trees, according to details released by the Royal Commission for Riyadh City. A central steel dome measuring 134 meters in diameter will be supported by eight branching columns modeled after acacia trees to provide shaded public spaces. The design further integrates around 44,000 square meters of green areas and solar energy systems expected to supply about 25 percent of the station’s power requirements.
Construction follows a detailed schedule integrated with Expo site preparations to guarantee completion before the exhibition opens, the commission stated. The station will remain operational afterward to support ongoing transport demands in the surrounding districts. A traffic management strategy developed with concerned authorities includes alternative routes to limit impacts on local roadways and residential zones during the build phase.
A September report from Construction Review Online noted that the design-and-build contract for the station had been awarded after a tender process initiated in February 2026. The broader Expo 2030 Riyadh project carries an estimated total value of $7.8 billion and includes extensive site infrastructure across a six-square-kilometer area. The metro station represents a central element in preparations for an event projected to attract millions of international attendees over its six-month run.
The Riyadh Metro network, construction of which started in 2013, stands as a flagship component of Saudi Vision 2030 aimed at modernizing urban mobility and reducing reliance on private vehicles, according to an assessment published by Al Majalla. The 176-kilometer system with six lines is capable of moving more than one million passengers daily once fully active. Integration of the new Expo station builds on recent openings of initial lines that began public service in late 2025.
ع